
Monday, November 22, 2010
Not a lizard
I just can't leave it alone. The Hive Tyrant base is mostly done. There's still several tweaks and at least two holes that have to be drilled, but that's all easy stuff.
I need to cut a cleft from the left side to break up the straight line and to counterbalance the two ridges on the other sides; while you can't see it, I also need to finish sealing up several places on the ridges and the underside of the "rock." I'm going to also experiment with adding rough-grain sand to the edges of the rock -- the end result will be basalt in a lava flow, and having some texture implying that the rock is being devoured by lava would be nice. Why rock-in-lava? I want to try lighting techniques on something I can easily remake or reprime before going to town with it on Skarre.

Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment